Largest Upcoming Public Construction Bids
The largest public construction bids opening in the next 60 days, ranked by source-published estimated value. Transit, highway, water, and major facilities work — each entry pulled from official lettings or plan rooms with the engineer's estimate the agency published.
Why track the largest projects?
Larger projects need broad supply chains. A high-value transit, highway, or facility job pulls in concrete, steel, electrical, mechanical, and specialty trades. Even if you can't bid the prime contract, these projects create subcontracting opportunities. Knowing what's coming helps you position your company for the work that follows.
Current Top Projects
US 59 Widening 2712 - Phase 1
Upgrade to Rural Freeway (Future I-69 Corridor) Construct main lanes, frontage roads and structures to convert 4 lane divided highway to 6 lane divide...
Interchange@Uniroyal Dr&SH 84
IH-35 RECONSTRUCTION & INTERCHANGES(RECONSTRUCTED/NEW)@UNIROYAL DR & SH 84. Classification: Interchange (New or Reconstructed). Limits: 0.47 MI S OF U...
I-80 Sec 17M Breakout #1 (Exit 303)
I-80 Sec 17M Breakout #1 (Exit 303) Agency: Pennsylvania
US 81/287; N of Harmon Rd to N of IH 35W
RECONSTRUCT NB AND SB EXIT RAMP TO HARMON ROAD/NORTH TARRANT PARKWAY AND SB ENTRANCE RAMP FROM HARMON ROAD. Classification: Intersection & Operational...
US 81; N of Harmon Rd to N of IH 35W
RECONSTRUCT 2 TO 2 LANE NORTHBOUND FRONTAGE ROAD. Classification: Intersection & Operational Imprv. Limits: N of Harmon Road to N of IH 35W. Highway:...
US 287; N of Harmon Rd to N of IH 35W
RECONSTRUCT 2 LANE ONE WAY TO 2 LANE ONE WAY SOUTHBOUND FRONTAGE ROAD. Classification: Intersection & Operational Imprv. Limits: N of Harmon Road to N...
CS; @ US 81/287 TO FM 3479/HARMON/N TAR
CONSTRUCT NORTH TARRANT PARKWAY OVER US 81/287 WITH TURNAROUND ON EASTSIDE; CONSTRUCT HARMON RD OVER US 81/287. Classification: Interchange (New or Re...
US 81287; N OF FM 3479 TO N OF IH35W INT
CONSTRUCT AUXILIARY LANE FOR NORTHBOUND EXIT TO NORTH TARRANT PARKWAY; AUXILIARY LANE FOR SOUTHBOUND ENTRANCE FROM NORTH TARRANT PKWY. Classification:...
UA 90: FM 359 TO W of SH 99
Reconstruct and Widen from 4 to 6-Lane Divided (Phase 2 of 3). Classification: Widen Non-Freeway. Limits: FM 359 to W of SH 99. Highway: UA 90. Distri...
SL 335 B-2: NEW LOCATION AMA LOOP, PH V
B-2 PHASE V: CONSTRUCT 4 NEW MAINLANES, RAMPS, AND ARDEN ROAD GRADE SEPARATION. Classification: New Location Freeway. Limits: NORTH OF FM 2186 to NORT...
Understanding large public project procurement
Projects at this scale often use Design-Build or Construction Manager at Risk delivery. Prime contractors are typically larger national or regional firms with deep bonding capacity. Even so, every project needs specialty contractors, equipment suppliers, and material vendors.
If you're a subcontractor, watch these projects to understand what's coming to your market. A larger public job creates demand for concrete, rebar, structural steel, mechanical systems, electrical, finishes, and site work. The prime contractor will be looking for qualified subs.
Track Projects That Fit Your Scope
Most contractors don't need the biggest projects. Sign up to filter by your state, your trades, and your project size range. See the work that actually fits what you do.
Start Free Trial14 days free. No credit card required.