Water and Sewer System Improvements
Overview
The Crane Union School District (Owner) is requesting Bids for the construction of the following Project: Water and Sewer System Improvements. The Project includes the following Work: The Work for this Contract generally involves constructing water and wastewater system improvements including furnishing and installing submersible pumps and pitless adapters in two wells; constructing a new well pump station including booster pumps; constructing a new wastewater lift station; constructing approximately 2.65 acres of wastewater lagoons and evaporative ponds including earthwork, lining of the lagoons and evaporative ponds, piping, and control structures; installing approximately 950 feet of 4-inch polyvinyl chloride water line, 820 feet of 8-inch gravity sewer, and approximately 1,160 feet of 2-inch high density polyethylene pressure pipe; installing electrical, controls, and instrumentation; monitoring and telemetry work; fencing; and painting; together with all other Work required to complete the Project as shown on the Drawings and specified herein.
Project Details
- Agency / Owner
- Crane Union School District
CSI Divisions
Key Dates
- Bid Due Date
- Tuesday, Apr 21, 2026
- Closed
Location
- City
- Crane
- County
- Harney
- State
- OR
Contact
Contact information available to members.
More OR Construction Bids
Parking Lot Striping and Related Services
City of Portland OR - Division Street Complete Street
Optometry services to support the Optometry Program at the Warm Springs Service Unit (WSSU)
Western Oregon Service Unit Dental Panoramic X-Ray Unit Replacement
Get Full Access to This Project
Sign up free to access complete project details, download documents, see contact information, and find similar projects in your area.
- Complete project description and scope
- Download plans, specs, and addenda
- Agency contact information
- Filter by your trades and location
14 days free. No credit card required.
Already have an account? Login