Skip to main content

Thief River Streambank Stabilization Project

Rural Thief River Falls, MN Bid Date: May 28, 2026

Overview

Three Streambank Stabilization sites located on the Thief River with the southern site approximately 6.5 miles north of Thief River Falls, MN. Sites were designed using bioengineering (toe-wood/sod mat) to the bank full heights. The remaining streambank above the bank full height is proposed to be excavated at varies slope for the majority of the project.

Project Details

Agency / Owner
Red Lake Watershed District

CSI Divisions

Div 06 - Wood, Plastics, and Composites Div 12 - Furnishings Div 32 - Exterior Improvements

Key Dates

Bid Due Date
Thursday, May 28, 2026
Closed

Location

City
Rural Thief River Falls
County
Marshall
State
MN

Contact

Contact information available to members.

More MN Construction Bids

Get Full Access to This Project

Sign up free to access complete project details, download documents, see contact information, and find similar projects in your area.

  • Complete project description and scope
  • Download plans, specs, and addenda
  • Agency contact information
  • Filter by your trades and location
Start Free Trial

14 days free. No credit card required.

Already have an account? Login