Thief River Streambank Stabilization Project
Rural Thief River Falls, MN
Bid Date: May 28, 2026
Overview
Three Streambank Stabilization sites located on the Thief River with the southern site approximately 6.5 miles north of Thief River Falls, MN. Sites were designed using bioengineering (toe-wood/sod mat) to the bank full heights. The remaining streambank above the bank full height is proposed to be excavated at varies slope for the majority of the project.
Project Details
- Agency / Owner
- Red Lake Watershed District
CSI Divisions
Div 06 - Wood, Plastics, and Composites
Div 12 - Furnishings
Div 32 - Exterior Improvements
Key Dates
- Bid Due Date
- Thursday, May 28, 2026
- Closed
Location
- City
- Rural Thief River Falls
- County
- Marshall
- State
- MN
Contact
Contact information available to members.
More MN Construction Bids
Get Full Access to This Project
Sign up free to access complete project details, download documents, see contact information, and find similar projects in your area.
- Complete project description and scope
- Download plans, specs, and addenda
- Agency contact information
- Filter by your trades and location
14 days free. No credit card required.
Already have an account? Login