Skip to main content

Round Lake Drain Master Plan Project Phase 1 Project (SMC-2026003)

IN Bid Date: Jan 28, 2026

Overview

The Round Lake Drain Master Plan Project Phase 1 includes removing an existing 89 feet of 7.75’x7’ double barrel box culvert and replacing the box culvert system with 83 feet of a 9’x8’ triple barrel concrete box culverts for flood reduction. Work will include removal and demolition of existing conditions for the box culvert and roadway improvements in this local road carrying Village Drive over the Round Lake Drain. Tasks include removal and replacement of the existing concrete box culvert, headwalls, wingwalls, railings, grading, streambank stabilization, hot mix asphalt, curb and gutter, riprap, storm sewer, and landscape restoration. The work also includes carrying out all duties and obligations and the furnishing of all labor, material, tools, equipment, and other incidentals necessary or convenient for the successful completion of the project.

Project Details

Agency / Owner
Lake County, IN
Project Number
SMC-2026003

CSI Divisions

Div 32 - Exterior Improvements Div 02 - Existing Conditions Div 22 - Plumbing Div 33 - Utilities Div 34 - Transportation Div 03 - Concrete Div 07 - Thermal and Moisture Protection Div 31 - Earthwork

Key Dates

Bid Due Date
Wednesday, Jan 28, 2026
Closed

Location

State
IN

More IN Construction Bids

Get Full Access to This Project

Sign up free to access complete project details, download documents, see contact information, and find similar projects in your area.

  • Complete project description and scope
  • Download plans, specs, and addenda
  • Agency contact information
  • Filter by your trades and location
Start Free Trial

14 days free. No credit card required.

Already have an account? Login