Office and Shop Improvements
Overview
The Project includes the following Work: The Work for this Contract involves the installation of a new 80-foot by 60-foot pre-engineered metal shop building with an attached 56-foot by 46-foot pre engineered metal office building. The Work includes excavation for the building foundation; construction of a reinforced concrete foundation system; water, sewer, and drain piping; building construction, including internal framing, finishing, furnishings, etc.; building heating, ventilation, and air conditioning; electrical work; a standby power generator; and site work; together with all other Work required to complete the Project as shown on the Drawings and specified herein.
Project Details
- Agency / Owner
- Ice Fountain Water District
CSI Divisions
Key Dates
- Bid Due Date
- Thursday, Apr 23, 2026
- Closed
Location
- City
- Hood River
- County
- Hood River
- State
- OR
Contact
Contact information available to members.
More OR Construction Bids
Parking Lot Striping and Related Services
City of Portland OR - Division Street Complete Street
Optometry services to support the Optometry Program at the Warm Springs Service Unit (WSSU)
Western Oregon Service Unit Dental Panoramic X-Ray Unit Replacement
Get Full Access to This Project
Sign up free to access complete project details, download documents, see contact information, and find similar projects in your area.
- Complete project description and scope
- Download plans, specs, and addenda
- Agency contact information
- Filter by your trades and location
14 days free. No credit card required.
Already have an account? Login