MCWC Water Distribution Improvements - East Line Phase 1 # 24428.00
Overview
Construction of 16-inch & 20-inch diameter potable water transmission main from the Shared Resources East Tower near Trent, SD to the MCWC East Service Area. The water main construction consists of about 42,000 linear feet of 16-inch & 21,000 linear feet of 20-inch PVC water main installed by open excavation and horizontal directional drilling methods, ductile iron fittings and restraints, highway crossings with jack & bored 30” & 36” casing pipe, isolation gate valves, manual air release valves, tracer wire, erosion control, seeding & restoration, pressure testing & disinfection, cleanup, startup services, and all other miscellaneous work required not herein mentioned but inferred from the construction Contract Documents.
CSI Divisions
Key Dates
- Bid Due Date
- Tuesday, Jun 02, 2026
- Closed
Location
- State
- SD
Contact
Contact information available to members.
More SD Construction Bids
Get Full Access to This Project
Sign up free to access complete project details, download documents, see contact information, and find similar projects in your area.
- Complete project description and scope
- Download plans, specs, and addenda
- Agency contact information
- Filter by your trades and location
14 days free. No credit card required.