Madison NW 5th Street Bridge Backwall Repairs #24688.00
Overview
• Furnish and Install temporary traffic control barricades, signage, road closures; • Furnish and Install erosion and sediment control devices; • Saw approximately 188 LF of Asphalt Concrete Pavement; • Remove approximately 120 SY of Asphalt Concrete Pavement; • Approximately 264 CY of Unclassified Excavation; • Furnish and Install approximately 320 SY of Type B Drainage Fabric; • Furnish and Install approximately 270 ton of Type 1 Drainage Rock; • Remove approximately 70 LF of Storm Sewer Pipe; • Furnish and Install approximately 70 LF of Storm Sewer Pipe; • Furnish and Install approximately 120 SY of Geotextile Fabric; • Furnish and Install approximately 100 Ton of Base Course; • Furnish and Install approximately 120 SY of 4” Asphalt Concrete.
CSI Divisions
Key Dates
- Bid Due Date
- Thursday, May 21, 2026
- Closed
Location
- State
- SD
Contact
Contact information available to members.
More SD Construction Bids
Get Full Access to This Project
Sign up free to access complete project details, download documents, see contact information, and find similar projects in your area.
- Complete project description and scope
- Download plans, specs, and addenda
- Agency contact information
- Filter by your trades and location
14 days free. No credit card required.
Already have an account? Login