Charter Township of Breitung - 2026 Lead Service Line Replacement
Overview
Concrete Walkway,Concrete/Formed/Flatwork/Foundation,Construction,Curbs,Directional Bore,Directional Drilling,Erosion Control - Temporary,Excavation,Fittings and Valves,Grade and Surface,Landscaping,Pavement Removal,Paving (Highway, Road or Street),Plumbing,Removal and Replacement of pipe,Sawcutting/Sidewalk/Pavement,Sewer and Water Construction,Sidewalks/Curbs/Gutters,Sitework/Excavating and Grading,Street/Road Materials,Street/Road Repairs,Traffic Control,Traffic Control Devices (Signals, Signing, etc.),Traffic Control Signal Systems,Trenchless Utility Construction,Utility Street Construction and Excavation,Water Infrastructure (Water Meters),Water Main (Repair/Replace) Rehabilitation,Water Resources Infrastructure, Equip Repair,Water Utilities,Waterlines
Project Details
- Agency / Owner
- Charter Township of Breitung
CSI Divisions
Key Dates
- Bid Due Date
- Monday, Jun 08, 2026
- Closed
Location
- City
- Kingsford
- County
- Dickinson
- State
- MI
Contact
Contact information available to members.
Get Full Access to This Project
Sign up free to access complete project details, download documents, see contact information, and find similar projects in your area.
- Complete project description and scope
- Download plans, specs, and addenda
- Agency contact information
- Filter by your trades and location
14 days free. No credit card required.
Already have an account? Login