Build the necessary infrastructure and power supply to enable charging of hybrid electric ferries at Colman Dock Slips #1 and #3
$100M
WA
Bid Date: Nov 23, 2026
Project Description
The design build contractor will work closely and collaboratively with the Washington State Ferries, systems integrator, vessel charging system (VCS) supplier, and Seattle City Light to provide a complete system.
Project Details
- Agency / Owner
- WA State DOT Contracts
CSI Divisions
Div 26 - Electrical
Div 35 - Waterway and Marine
Key Dates
- Bid Due Date
- Monday, Nov 23, 2026
- 9 months from now
Location
- State
- WA
More WA Construction Bids
Get Full Access to This Project
Sign up free to access complete project details, download documents, see contact information, and find similar projects in your area.
- Complete project description and scope
- Download plans, specs, and addenda
- Agency contact information
- Filter by your trades and location
14 days free. No credit card required.
Already have an account? Login