Skip to main content

Build the necessary infrastructure and power supply to enable charging of hybrid electric ferries at Colman Dock Slips #1 and #3

$100M WA Bid Date: Nov 23, 2026

Project Description

The design build contractor will work closely and collaboratively with the Washington State Ferries, systems integrator, vessel charging system (VCS) supplier, and Seattle City Light to provide a complete system.

Project Details

Agency / Owner
WA State DOT Contracts

CSI Divisions

Div 26 - Electrical Div 35 - Waterway and Marine

Key Dates

Bid Due Date
Monday, Nov 23, 2026
9 months from now

Location

State
WA

More WA Construction Bids

Get Full Access to This Project

Sign up free to access complete project details, download documents, see contact information, and find similar projects in your area.

  • Complete project description and scope
  • Download plans, specs, and addenda
  • Agency contact information
  • Filter by your trades and location
Start Free Trial

14 days free. No credit card required.

Already have an account? Login