Big Sioux CWS Distribution Improvements - Lake Madison and West Phase 1 #24417.00 & #24418.00
Overview
Construction of approximately 12,725 LF of 16-inch diameter watermain, 6,000 LF of 12-inch diameter watermain, 4,400 LF of 10-inch diameter watermain, 13,900 LF 8-inch diameter watermain and 5,280 LF of 3-inch diameter watermain. The water main construction consists of PVC water main installed by open excavation and horizontal directional drilling methods, ductile iron fittings and restraints, highway crossings with jack & bored casing pipe, isolation gate valves, manual air release valves, sacrificial corrosion protection system, tracer wire, erosion control, seeding & restoration, pressure testing & disinfection, cleanup, startup services, and all other miscellaneous work required not herein mentioned but inferred from the construction Contract Documents.
Project Details
- Agency / Owner
- Big Sioux Community Water System
CSI Divisions
Key Dates
- Bid Due Date
- Wednesday, Apr 08, 2026
- Closed
Location
- City
- Egan
- County
- Moody
- State
- SD
Contact
Contact information available to members.
More SD Construction Bids
Get Full Access to This Project
Sign up free to access complete project details, download documents, see contact information, and find similar projects in your area.
- Complete project description and scope
- Download plans, specs, and addenda
- Agency contact information
- Filter by your trades and location
14 days free. No credit card required.
Already have an account? Login