Skip to main content

Big Sioux CWS Distribution Improvements - Lake Madison and West Phase 1 #24417.00 & #24418.00

Egan, SD Bid Date: Apr 08, 2026

Overview

Construction of approximately 12,725 LF of 16-inch diameter watermain, 6,000 LF of 12-inch diameter watermain, 4,400 LF of 10-inch diameter watermain, 13,900 LF 8-inch diameter watermain and 5,280 LF of 3-inch diameter watermain. The water main construction consists of PVC water main installed by open excavation and horizontal directional drilling methods, ductile iron fittings and restraints, highway crossings with jack & bored casing pipe, isolation gate valves, manual air release valves, sacrificial corrosion protection system, tracer wire, erosion control, seeding & restoration, pressure testing & disinfection, cleanup, startup services, and all other miscellaneous work required not herein mentioned but inferred from the construction Contract Documents.

Project Details

Agency / Owner
Big Sioux Community Water System

CSI Divisions

Div 31 - Earthwork Div 32 - Exterior Improvements Div 22 - Plumbing Div 33 - Utilities Div 00 - Procurement and Contracting Requirements Div 01 - General Requirements Div 05 - Metals Div 26 - Electrical Div 34 - Transportation

Key Dates

Bid Due Date
Wednesday, Apr 08, 2026
Closed

Location

City
Egan
County
Moody
State
SD

Contact

Contact information available to members.

More SD Construction Bids

Get Full Access to This Project

Sign up free to access complete project details, download documents, see contact information, and find similar projects in your area.

  • Complete project description and scope
  • Download plans, specs, and addenda
  • Agency contact information
  • Filter by your trades and location
Start Free Trial

14 days free. No credit card required.

Already have an account? Login